The speculative corner.
Small Nordic companies trading below DKK 3 a share, often with little revenue and a short cash runway. We give each one two separate ratings.
High risk. Most stocks at this price lose money, dilute their shareholders and can go to zero. A high asymmetry rating is not a recommendation; it only says the possible upside is large relative to what we think could go wrong. Not investment advice.
Two ratings, side by side
Bjarvik score · 1–100
The normal Bjarvik model: business, price and cracks. It measures quality, and penny stocks usually score low.
Asymmetry · 1–10
A separate speculative rating of potential against risk: market value, upcoming catalysts, partners, cash runway and how close the price is to its low.
The list
Sorted by asymmetry. Price and market value in DKK; runway in months; dilution is the growth in share count over the last 12 months.
| Company | Price | Asymmetry | Bjarvik | Next catalyst |
|---|---|---|---|---|
| Pricer Sweden · Tech hardware & optics | 2.60 | 6 | 62 | 22 Oct 2026Q3 2026 report: how much of the Carrefour decline comes through, and whether the gross margin of approx. 28% holds |
| OssDsign Sweden · Pharma & medtech | 2.29 | 5 | 65 | 3 Nov 2026Q3 report: shows whether Catalyst sales turn after the rebuilding of the sales force |
| Spanish Mountain Gold Canada · Commodities & uranium | 1.42 | 5 | 59 | 26 Nov 2026Q3 report (estimated date) – cash and burn |
| District Metals Canada · Commodities & uranium | 2.09 | 5 | 55 | Q4 2026New Swedish government after the election 13/9-2026 - its line on uranium mining, alum shale and the removed municipal veto |
| Cantargia Sweden · Pharma & medtech | 0.96 | 5 | 54 | 25 Nov 2026Q3 report: cash after the share issue and update on the MDS/AML study |
| KebNi Sweden · Defence, aerospace & space | 0.51 | 5 | 53 | 16 Feb 2027Annual accounts 2026: first year after the issue and the doubling of IMU capacity |
| Precise Biometrics Sweden · Software, cloud & internet | 0.34 | 5 | 50 | 13 Nov 2026Q3 2026 report: first quarter with Fingerprint Cards consolidated, cash after the issue and synergy status |
| Sintana Energy Canada · Oil & gas | 1.60 | 5 | 49 | End of 2026High-impact exploration well on PEL 90 (Namibia), Sintana fully funded |
| Elicera Therapeutics Sweden · Pharma & medtech | 1.84 | 5 | 49 | 27 Nov 2026Q3 report and updated follow-up on durability of responders in phase 1 |
| Mogotes Metals Canada · Commodities & uranium | 2.18 | 5 | 47 | The 2026–27 season (southern summer)Up to 20,000 m of drilling at Filo Sur: expansion of Albor and Cruz del Sur and first porphyry tests at Luz del Sol-Cuenca and Meseta |
| CanAlaska Canada · Commodities & uranium | 1.44 | 5 | 46 | Q4 2026Assay results from the 2026 summer drilling at West McArthur (step-outs along the C10S corridor from Pike Zone; the programme ended in September) |
| PetroTal Canada · Oil & gas | 2.60 | 4 | 59 | 13 Nov 2026Q3 2026 report (estimated date) – production, cash and possible dividend signal |
| Context Therapeutics United States · Pharma & medtech | 1.98 | 4 | 58 | 4 Nov 2026Q3 report: confirmation of first patient in CT-202 and cash |
| Greenlane Renewables Canada · Machinery & automation | 0.86 | 4 | 57 | 12 Nov 2026Q3 2026 results with order backlog and order intake |
| Xtract One Canada · Tech hardware & optics | 2.32 | 4 | 57 | FY2027Installation of C$27.2m in agreements awaiting installation – must be converted into revenue and subscriptions |
| Senzime Sweden · Pharma & medtech | 1.79 | 4 | 57 | Q4 2026 (report approx. Feb. 2027)The company's target of profitability in Q4 2026 |
Kongsberg AutomotiveNorway · Autos & parts | 1.38 | 4 | 56 | Jun 2028EUR 110m bond matures - possible early refinancing at a lower rate; target of 6.5% EBIT margin |
| Mereo BioPharma United States · Pharma & medtech | 2.65 | 4 | 56 | 9 Nov 2026Q3 report: cash and status of Sentynl and regulatory dialogue |
| aTyr Pharma United States · Pharma & medtech | 2.00 | 4 | 55 | 5 Nov 2026Q3 report: cash, new CFO and financing plan for phase 3 |
| Defense Metals Canada · Commodities & uranium | 0.60 | 4 | 55 | 2026-11-27 (estimated)Q2 FY2027 results (to 30/9) – cash and status of the DFS |
| Stenocare Denmark · Pharma & medtech | 0.90 | 4 | 54 | No date (decree sent to the Conseil d'État 2/7-2026)French decree on price and reimbursement for medical cannabis is adopted, so ASTRUM 10-10 can apply for access |
| Lahontan Gold Canada · Commodities & uranium | 1.76 | 4 | 53 | 25 Nov 2026Q3 report (estimated date) – cash and burn |
| ShaMaran Petroleum Norway · Oil & gas | 0.99 | 4 | 53 | 9 Nov 2026Q3 2026 results: status of shutdown/restart of Atrush and Sarsang, cash and PSC payments |
| Cassiar Gold Canada · Commodities & uranium | 2.21 | 4 | 53 | Q4 2026Assay results from the 2026 drilling campaign (7,400 of 10,000 m drilled at Taurus and Newcoast as of 17/9) |
| Gunnison Copper Canada · Commodities & uranium | 2.14 | 4 | 52 | 13 Nov 2026Q3 2026 results (estimated) – first quarter with commercial production at Johnson Camp |
| Ferroamp Sweden · Grid & electrical equipment | 1.63 | 4 | 51 | 2026-11-06 (stockanalysis estimates 2026-11-09)Q3 report: does sales hold the Q2 level (60m), and is EBITDA positive per month? |
| Brunswick Exploration Canada · Commodities & uranium | 1.14 | 4 | 51 | 6 Nov 2026Q3 results (estimated date) – cash after the summer programme |
| Oroco Resource Canada · Commodities & uranium | 2.14 | 4 | 50 | Q4 2026 (ongoing)Remaining phase 2 analyses from South Zone and start of drilling in Pillar Zone |
| Bluelake Mineral Sweden · Commodities & uranium | 0.88 | 4 | 49 | 18 Nov 2026Q3 report (estimated date): cash after the issue, drilling results at Joma/Gjersvik and timeline for the PFS |
| Laramide Resources Canada · Commodities & uranium | 2.14 | 4 | 49 | 13 Nov 2026Q3 report (estimated date) – cash after the placement |
| Elliptic Labs Norway · Software, cloud & internet | 2.27 | 4 | 48 | 19 Nov 2026Q3 2026 report: does revenue show that the laptop contracts exceed the minimum thresholds? |
| Nykode Norway · Pharma & medtech | 2.38 | 4 | 48 | 25 Nov 2026Q3 report: update on recruitment in Abili-T and booking of the lost tax case |
| Midsummer Sweden · Chip equipment | 0.89 | 4 | 48 | 2026 (ongoing)Delivery and revenue recognition of most of the SEK 236m order |
| Innoviz United States · Autos & parts | 2.39 | 4 | 48 | 11 Nov 2026Q3 report: NRE payments, progress towards guidance (67–73m USD) and new programmes |
| IRLAB Therapeutics Sweden · Pharma & medtech | 1.18 | 4 | 47 | 13 Nov 2026Q3 report |
| Viaplay Sweden · Software, cloud & internet | 0.76 | 4 | 47 | Q4 2026Completion of the sale of Holland (142 m EUR) – net debt falls about 30% |
| Crunchfish Sweden · Software, cloud & internet | 1.45 | 4 | 46 | 12 Nov 2026Q3 report: cash, any strategic investor and status of NPCI, GCash and Mercury |
| Dicot Pharma Sweden · Pharma & medtech | 0.15 | 4 | 46 | Q4 2026Decision on the EU application (CTA) for phase 2b |
| Sun Summit Minerals Canada · Commodities & uranium | 0.65 | 4 | 46 | Q4 2026 (ongoing)Assay results from 55 holes (over 16,000 m) on the Creek, Finn and Schmitt zones |
| F3 Uranium Canada · Commodities & uranium | 0.56 | 4 | 46 | Q4 2026Remaining results from the 2026 summer programme (about 4,000 m; the A4 conductor, Broach Lake, JR's south-eastern extension and the Tetra area) |
| Intrum Sweden · Financial data & insurance broking | 2.02 | 4 | 45 | 2027Refinancing of new money notes (maturing Dec. 2027) and first exchange notes – test of market access after Chapter 11 |
| Lucara Diamond Canada · Commodities & uranium | 0.78 | 4 | 45 | 6 Nov 2026Q3 2026 report (estimated date): diamond prices, stockpile processing and UGP progress |
| Questerre Energy Canada · Oil & gas | 1.40 | 4 | 45 | 12 Nov 2026Q3 2026 results: shows whether sales in Brazil have reached the contract minimum, and whether the inventory of 40,000 barrels has been sold |
| Excellon Resources Canada · Commodities & uranium | 1.58 | 4 | 45 | 13 Nov 2026Q3 2026 report (estimated) – first concentrate sales and cash balance |
| Emerita Resources Canada · Commodities & uranium | 1.65 | 4 | 45 | Q4 2026Publication of the PFS for Iberian Belt West (NPV, IRR, capex) - 'in the coming weeks' after extended review |
| Akobo Minerals Norway · Commodities & uranium | 1.20 | 4 | 45 | Q4 2026Vertical shaft reaches first lateral level – target of 50 kg/month (about 5x current) |
| Initiator Pharma Sweden · Pharma & medtech | 1.35 | 4 | 45 | 20 Nov 2026Q3 report with status of recruitment for the vulvodynia study and cash |
| Salmon Evolution Norway · Food, drinks & restaurants | 2.28 | 4 | 44 | Q4 2026First harvest from phase 2 (Indre Harøy) and handover of the last 8 of 12 growth tanks during 2026 |
| Southern Silver Canada · Commodities & uranium | 2.37 | 4 | 43 | Q4 2026Updated resource estimate with Puro Corazon (planned for Q3 2026) |
| Diamyd Medical Sweden · Pharma & medtech | 0.69 | 4 | 43 | Not disclosed (the company only reports on the final outcome)Outcome of strategic review: sale/out-licensing of retogatein, sale of the Umeå factory or a transaction with one of the shortlisted counterparties |
| Global Atomic Canada · Commodities & uranium | 1.79 | 4 | 42 | 13 Nov 2026Q3 results (estimated date) – cash, capex burn and status of DFC conditions |
| Alzinova Sweden · Pharma & medtech | 0.26 | 4 | 41 | 12 Nov 2026Q3 report |
| Ascelia Pharma Sweden · Pharma & medtech | 0.54 | 4 | 41 | 5 Nov 2026Q3 report with cash and burn after the savings |
| DMG Blockchain Canada · Software, cloud & internet | 2.37 | 4 | 39 | 18 Dec 2026Annual accounts 2025/26 (Q4) with bitcoin holdings and debt |
| Clavister Sweden · Software, cloud & internet | 2.84 | 3 | 68 | 12 Nov 2026Q3 2026 report: do the margin and order intake hold after the record quarter? |
| Deoleo Spain · Food, drinks & restaurants | 2.64 | 3 | 60 | Q4 2026 – H1 2027The Spanish government's approval or blocking of a foreign takeover (investment screening) |
| OHLA Spain · Construction & materials | 2.62 | 3 | 59 | Nov 2026Q3 2026 report: whether the margin improvement in construction (7.3% EBITDA margin) holds, and whether the cash flow continues |
| Mega Uranium Canada · Commodities & uranium | 2.30 | 3 | 55 | 18 Dec 2026Annual accounts for the financial year to 30/9-2026 (estimated date) – updated portfolio and debt |
| Sprint Bioscience Sweden · Pharma & medtech | 2.28 | 3 | 52 | Not disclosedThe first development milestone from Gilead on TREX1 (part of up to USD 400m) |
| Oncopeptides Sweden · Pharma & medtech | 1.44 | 3 | 51 | 5 Nov 2026Q3 report: sales growth, burn and cash (runway) |
| Touchstone Exploration Canada · Oil & gas | 0.79 | 3 | 51 | 13 Nov 2026Q3 2026 results (estimated) – first quarter with full compressor effect; status of covenant waiver and going concern |
| Rekor Systems United States · Software, cloud & internet | 2.43 | 3 | 49 | 2026-11-12 (estimated)Q3 report: test of the target of positive adjusted EBITDA in H2 2026 |
| Pharol Other · Financial data & insurance broking | 0.67 | 3 | 49 | 2026–27First investments or new strategy under chairman João Moreira Rato (approved by the ECB on 17/8-2026, mandate to 2028) |
| Focus Graphite Canada · Commodities & uranium | 1.93 | 3 | 49 | 2026-12-23 (estimated)Annual accounts FY2026 (to 30/9) – cash, going concern and warrant status |
| BioPorto Denmark · Pharma & medtech | 1.05 | 3 | 49 | 19 Nov 2026Q3 report: NGAL growth after recall and cash balance |
| Scandinavian Medical Solutions Denmark · Pharma & medtech | 2.37 | 3 | 47 | 19 Nov 2026Annual report 2025/26: actual EBITDA vs −9 to −13m, inventory value, writedowns and expectations for 2026/27 |
| Premier American Uranium Canada · Commodities & uranium | 1.49 | 3 | 47 | 20 Nov 2026Q3 report (estimated date) – cash after the drilling season |
| Guanajuato Silver Canada · Commodities & uranium | 1.83 | 3 | 46 | 27 Nov 2026Q3 2026 report (estimated date) – margin, cash and AISC after record capex |
| Medivir Sweden · Pharma & medtech | 1.06 | 3 | 45 | 5 Nov 2026Q3 report (recruitment in FLEX-HCC and start of OI and Perthes studies) |
| Verimatrix France · Software, cloud & internet | 2.34 | 3 | 45 | Approx. March 2027Annual accounts 2026: does it reach the Anti-Piracy EBITDA target of at least USD 3m, and does revenue return to growth? |
| Evogene United States · Pharma & medtech | 2.61 | 3 | 44 | 2026-11-19 (approx.)Q3 2026 results: cash burn and any paid ChemPass agreements |
| HPQ Silicon Canada · Commodities & uranium | 0.63 | 3 | 44 | 2026-11-27 (estimated)Q3 2026 results – shows whether new capital has been raised, and how the HSPI transaction is booked |
TobiiSweden · Tech hardware & optics | 0.73 | 3 | 43 | Q4 2026Outcome of strategic review: divestment/partnership in Autosense or capital raise |
| Acarix Sweden · Pharma & medtech | 0.13 | 3 | 43 | 5 Nov 2026Q3 report: sales in the USA, systems and patches, and cash |
| Heron Therapeutics United States · Pharma & medtech | 2.07 | 3 | 43 | 3 Nov 2026Q3 report with terms of the Long Grove licence and update on CINVANTI and the strategic process |
| AEON Biopharma United States · Pharma & medtech | 1.98 | 3 | 43 | 13 Nov 2026Q3 report with cash and runway after the July issue |
| Prairie Operating United States · Oil & gas | 2.71 | 3 | 43 | 2026-11-13 (approx.)Q3 2026 results: first quarter under the new minimum production covenant; August production was approx. 27,000 boe/d |
| Hofseth BioCare Norway · Food, drinks & restaurants | 0.88 | 3 | 42 | 6 Nov 2026Q3 2026 report: effect of the price increases on ProGo/OmeGo and whether operations are close to EBITDA balance |
| Smoltek Sweden · Semiconductors | 0.88 | 3 | 42 | 5 Nov 2026Q3 report: first quarter with the issue money, cash and any customer agreements |
| PyroGenesis Canada · Machinery & automation | 1.39 | 3 | 41 | Nov 2026Q3 2026 results (Q3 2025 came in November) – shows whether revenue growth and the lower loss hold, and how liquidity is after the July maturity |
| Purepoint Uranium Canada · Commodities & uranium | 1.30 | 3 | 41 | 27 Nov 2026Q3 report (estimated date) – cash and financing need |
| Observe Medical Norway · Pharma & medtech | 0.62 | 3 | 40 | Q4 2026Target of positive operating cash flow; if not reached, new financing is required (going concern qualification) |
| PILA PHARMA Sweden · Pharma & medtech | 1.16 | 3 | 40 | Turn of the year 2026/27Result of part 1: safety and tolerability at high doses plus the first weight data |
| Danish Aerospace Denmark · Defence, aerospace & space | 2.40 | 3 | 40 | approx. 2026-11-24Q3 update: liquidity, whether the postponed orders have come in, and whether guidance (18–20m DKK) holds |
| HydrogenPro Norway · Grid & electrical equipment | 0.32 | 3 | 40 | 13 Nov 2026Q3 report: cash, burn and status of the strategic review |
| Latecoere France · Defence, aerospace & space | 0.08 | 3 | 40 | Q1 2027 (March)Annual accounts 2026: shows whether the aerostructure loss has turned and whether FCF holds |
| Volatus Aerospace Canada · Defence, aerospace & space | 2.51 | 3 | 39 | 13 Nov 2026Q3 2026 results (estimated date) – shows whether the postponed defence order of approx. 2.6m C$ has been delivered |
| Capsol Technologies Norway · Machinery & automation | 2.96 | 3 | 39 | 11 Nov 2026Q3 2026 report: liquidity, drawdown on the DNB facility and any capital raise |
| Ocean GeoLoop Norway · Machinery & automation | 0.65 | 3 | 38 | 5 Nov 2026Q3 report: cash, burn and status of COOL and the new CEO |
| Photon Energy Poland · Utilities & power | 2.06 | 3 | 38 | Q4 2026New vote among the bondholders on a joint representative and an independent business review, then a concrete restructuring proposal |
| SBB Sweden · Construction & materials | 1.83 | 3 | 36 | 24 Nov 2026Q3 2026 report: LTV, refinancing of the 13% preferred shares and plan for 2027 maturities |
| Vantiva France · Tech hardware & optics | 0.57 | 3 | 35 | Nov–Dec 2026Move of the listing to Euronext Growth (at the earliest two months after 23/9-2026, requires Euronext's approval) |
| Sernova Canada · Pharma & medtech | 0.49 | 3 | 35 | Nov 2026Shareholder meeting and closing of the merger of Seraxis into BetaNova Biotherapeutics (requires 2/3 majority, court and TSX approval); Sernova shareholders get about 50% |
| K33 Sweden · Financial data & insurance broking | 0.01 | 3 | 35 | 26 Nov 2026Q3 2026 report: liquidity, bitcoin holdings and whether the MiCA expansion gives volume |
| Canaan United States · Tech hardware & optics | 2.27 | 3 | 34 | 2026-11-17 (approx.)Q3 2026 results: guidance is only 11–15m USD in revenue; focus on cash and burn |
| Silver Storm Mining Canada · Commodities & uranium | 2.41 | 3 | 33 | 24 Nov 2026Report for the quarter to 30/9/2026 (estimated) – first sales from the oxide and sulphide circuit and new cash balance |
| Aston Martin United Kingdom · Autos & parts | 2.97 | 3 | 32 | Ongoing from 2026-08 (monthly)Test of the minimum liquidity covenant under the new HPS loan agreement |
| Desert Control Norway · Construction & materials | 0.25 | 3 | 32 | 20 Nov 2026Q3 2026 report: first evidence of whether guidance of about USD 2m for 2026 holds |
Norway · Grid & electrical equipment | 1.43 | 3 | 32 | latest about December 2026New CEO (Volldal stepped down with six months' notice in June) |
| Realbotix Canada · Machinery & automation | 1.32 | 3 | 31 | autumn 2026Launch of new robot line: tabletop model at about USD 12,000 and full size at about USD 55,000 |
| Minesto Sweden · Grid & electrical equipment | 0.76 | 3 | 31 | Q4 2026 – Q1 2027Capital raise necessary (amount and form unknown) |
| Ferrexpo United Kingdom · Commodities & uranium | 2.76 | 3 | 30 | Ongoing 2026-2027Resumption of VAT refunds (102 m USD receivable) and return of more pellet lines; a ceasefire in Ukraine would be the big gradual driver |
| Lifecare Norway · Pharma & medtech | 0.35 | 3 | 29 | 12 Nov 2026Q3 report: cash, burn and update on production |
| Tullow Oil United Kingdom · Oil & gas | 0.89 | 3 | 28 | Q4 2026 (no fixed date)Agreement with Ghana's government on paying the tax bill of up to USD 393m – determines liquidity |
| Zenith Energy Norway · Oil & gas | 0.36 | 3 | 27 | Dec 2026Half-year report at 30/9-2026 (latest end of December) with status on cash, bond maturity and the Daybreak acquisition |
Norway · Transport & logistics | 0.21 | 3 | 20 | 1 Nov 2026The ACMI contract with IndiGo is ending; the last aircraft are returning and must be deployed on own routes (including Europe–Thailand) |
| Accuray United States · Pharma & medtech | 1.78 | 2 | 47 | 2026-11-04 (estimated)Q1 FY2027 report: order intake (−55% in Q4), China and margin after the cost programme |
| Flux Power United States · Grid & electrical equipment | 2.97 | 2 | 43 | 2026-11-12 (approx.)Q1 FY2027 results: revenue, gross margin and liquidity |
| SunPower United States · Utilities & power | 2.02 | 2 | 43 | 2 Nov 2026General meeting (virtual); possible proposals on reverse split and board |
| Vistagen United States · Pharma & medtech | 2.03 | 2 | 42 | 12 Nov 2026Q2 FY2027 report: cash at 30/9, burn and any update on the FDA meeting |
| Lion One Metals Canada · Commodities & uranium | 0.86 | 2 | 42 | 31 Dec 2026Deadline for repayment/refinancing of the Nebari loan (about 31.2 m US$) under the forbearance agreement |
| VolitionRx United States · Pharma & medtech | 1.70 | 2 | 41 | 12 Nov 2026Q3 report: cash after the Lind prepayment and financing |
| Episurf Sweden · Construction & materials | 0.05 | 2 | 38 | 2026-11-01 (planned)Acquisition of five property companies (approx. SEK 505m, binding agreement by 30/9) |
| Metacon Sweden · Grid & electrical equipment | 0.08 | 2 | 36 | 4 Nov 2026Q3 2026 report: cash after loan repayment, milestone payments and order book |
| Patagonia Gold Canada · Commodities & uranium | 1.97 | 2 | 36 | 2026-11 (estimated)Q3 2026 report – first full quarter of ramp-up at Calcatreu (production, sales, debt) |
| MindMaze Therapeutics Switzerland · Pharma & medtech | 1.19 | 2 | 36 | Ongoing 2026-27The reimbursement studies SwissNeuroRehab (Switzerland) and REACT-AVC (France) and rollout via Vibra Healthcare in the USA |
| Hilbert Group Sweden · Financial data & insurance broking | 1.13 | 2 | 34 | 30 Nov 2026Q3 report: fee income, effect of the savings, cash and use of the LDA facility |
| KALA BIO United States · Pharma & medtech | 2.82 | 2 | 33 | Nov 2026Due diligence on the telehealth acquisition is completed |
| Hyperscale Data United States · Software, cloud & internet | 1.09 | 2 | 32 | monthly from 2026Monthly status reports on the Michigan AI data centre and start-up of the first 20 MW under the master services agreement |
| GenSight Biologics France · Pharma & medtech | 0.70 | 2 | 31 | Q4 2026Meeting with the FDA on the final RECOVER protocol; last patient in the dose study REVISE (December) |
| Ebusco Netherlands · Autos & parts | 1.35 | 2 | 30 | Q4 2026 (early)Extraordinary general meeting: change of auditor from EY to CFA and Rhein Holding's seat on the supervisory board |
| Maisons du Monde France · Food, drinks & restaurants | 1.67 | 2 | 29 | Jan–Feb 2027Revenue for 2026 (incl. Christmas trade) - shows whether the decline stops under the new owners |
| Alligator Bioscience Sweden · Pharma & medtech | 0.01 | 2 | 28 | 2026 (no date)Sale or licence of mitazalimab, which the company will try in 2026 |
| Beowulf Mining Sweden · Commodities & uranium | 0.44 | 2 | 28 | Dec 2026–Mar 2027ISP decision on the Bacchus investment (review started 10/9, up to 3–6 months) |
| Ensurge Micropower Norway · Tech hardware & optics | 0.38 | 2 | 28 | 11 Nov 2026Q3 2026 report: cash, financing and customer validation |
| Cereno Scientific Sweden · Pharma & medtech | 2.65 | 2 | 26 | 4 Nov 2026Q3 report: cash, burn and any financing plan |
| Hexagon Purus Norway · Machinery & automation | 2.92 | 2 | 25 | No date (2026–2027)'Structural measures' for the convertible bonds – decide how much of the company shareholders keep |
| Path2 Hydrogen Germany · Machinery & automation | 1.64 | 2 | 24 | 2026 (no date)Capital increase via authorized capital and new shareholder loans |
| Techstep Norway · Software, cloud & internet | 2.51 | 1 | 34 | 11 Nov 2026Q3 2026 report: effect of the cost programme (target 218m NOK annualised cost base) and liquidity after the issue |
| ADLER Group Germany · Construction & materials | 0.73 | 1 | 26 | 26 Nov 2026Q3 2026 results: portfolio valuation, LTV and progress in sales |
| Datavault AI United States · Software, cloud & internet | 1.03 | 1 | 22 | 2026-11-16 (approx.)Q3 2026 results: test of guidance of approx. 200m USD for 2026 after 10m in H1 |
| Enviro Sweden · Construction & materials | 0.06 | 1 | 22 | 27 Nov 2026Expiry of the requested extension of the restructuring |
| ESS Tech United States · Grid & electrical equipment | 1.12 | 1 | 22 | 2026-11-12 (approx.)Q3 2026 results: cash, first Bridge orders and any binding Alsym agreement |
| XCF Global United States · Oil & gas | 2.24 | 1 | 21 | 2026-11-17 (approx.)Q3 2026 results: first quarter with BGN deliveries (over 10m USD in August) |
Norway · Commodities & uranium | 0.87 | 1 | 18 | 3 Nov 2026Q3 2026 report: production, product quality and new capital structure |
| Casino France · Food, drinks & restaurants | 1.28 | 1 | 16 | Mar 2027Maturity of the Term Loan B of 1.4 bn EUR |
| Leclanché Switzerland · Grid & electrical equipment | 0.67 | 1 | 16 | Q4 2026SIX's reaction to the missed final deadline: continued suspension, sanction or delisting |
Norway · Food, drinks & restaurants | 0.53 | 1 | 13 | by about 2026-11-28 at the latestCompulsory redemption of minority shareholders, expected at the offer price of NOK 0.80 (the offer period ended 28/8-2026; a price equal to the offer applies for redemption within 3 months) |
| Tessellis Italy · Software, cloud & internet | 0.58 | 1 | 10 | Q4 2026 – Q1 2027End of the 'composizione negoziata' (typically 180 + 180 days from the start in spring 2026): restructuring agreement, composition with creditors or liquidation – determines whether shareholders get anything |
| Risanamento Italy · Construction & materials | 0.33 | 1 | 7 | 10 Nov 2026The board is to approve the annual accounts for 2025 as well as Q1, H1 and Q3 2026 – the first full figures in over a year, incl. a going concern assessment |
Catalyst calendar
Upcoming events the companies or their sources point to. Binary events can move the price sharply either way.
- 2026-11-01 (planned)Episurf · Acquisition of five property companies (approx. SEK 505m, binding agreement by 30/9)gradual
- 1 Nov 2026Norse Atlantic · The ACMI contract with IndiGo is ending; the last aircraft are returning and must be deployed on own routes (including Europe–Thailand)gradual
- 2 Nov 2026SunPower · General meeting (virtual); possible proposals on reverse split and boardgradual
- 3 Nov 2026Heron Therapeutics · Q3 report with terms of the Long Grove licence and update on CINVANTI and the strategic processgradual
- 3 Nov 2026Nordic Mining · Q3 2026 report: production, product quality and new capital structuregradual
- 3 Nov 2026OssDsign · Q3 report: shows whether Catalyst sales turn after the rebuilding of the sales forcegradual
- 2026-11-04 (estimated)Accuray · Q1 FY2027 report: order intake (−55% in Q4), China and margin after the cost programmegradual
- 4 Nov 2026Cereno Scientific · Q3 report: cash, burn and any financing plangradual
- 4 Nov 2026Context Therapeutics · Q3 report: confirmation of first patient in CT-202 and cashgradual
- 4 Nov 2026Metacon · Q3 2026 report: cash after loan repayment, milestone payments and order bookgradual
- 5 Nov 2026Acarix · Q3 report: sales in the USA, systems and patches, and cashgradual
- 5 Nov 2026Ascelia Pharma · Q3 report with cash and burn after the savingsgradual
- 5 Nov 2026aTyr Pharma · Q3 report: cash, new CFO and financing plan for phase 3gradual
- 5 Nov 2026Medivir · Q3 report (recruitment in FLEX-HCC and start of OI and Perthes studies)gradual
- 5 Nov 2026Ocean GeoLoop · Q3 report: cash, burn and status of COOL and the new CEOgradual
- 5 Nov 2026Oncopeptides · Q3 report: sales growth, burn and cash (runway)gradual
- 5 Nov 2026Smoltek · Q3 report: first quarter with the issue money, cash and any customer agreementsgradual
- 6 Nov 2026Brunswick Exploration · Q3 results (estimated date) – cash after the summer programmegradual
- 2026-11-06 (stockanalysis estimates 2026-11-09)Ferroamp · Q3 report: does sales hold the Q2 level (60m), and is EBITDA positive per month?binary
- 6 Nov 2026Hofseth BioCare · Q3 2026 report: effect of the price increases on ProGo/OmeGo and whether operations are close to EBITDA balancegradual
- 6 Nov 2026Lucara Diamond · Q3 2026 report (estimated date): diamond prices, stockpile processing and UGP progressgradual
- 9 Nov 2026Mereo BioPharma · Q3 report: cash and status of Sentynl and regulatory dialoguegradual
- 9 Nov 2026ShaMaran Petroleum · Q3 2026 results: status of shutdown/restart of Atrush and Sarsang, cash and PSC paymentsgradual
- 10 Nov 2026Risanamento · The board is to approve the annual accounts for 2025 as well as Q1, H1 and Q3 2026 – the first full figures in over a year, incl. a going concern assessmentbinary
- 11 Nov 2026Capsol Technologies · Q3 2026 report: liquidity, drawdown on the DNB facility and any capital raisebinary
- 11 Nov 2026Ensurge Micropower · Q3 2026 report: cash, financing and customer validationbinary
- 11 Nov 2026Innoviz · Q3 report: NRE payments, progress towards guidance (67–73m USD) and new programmesgradual
- 11 Nov 2026Techstep · Q3 2026 report: effect of the cost programme (target 218m NOK annualised cost base) and liquidity after the issuebinary
- 12 Nov 2026Alzinova · Q3 reportgradual
- 12 Nov 2026Clavister · Q3 2026 report: do the margin and order intake hold after the record quarter?gradual
- 12 Nov 2026Crunchfish · Q3 report: cash, any strategic investor and status of NPCI, GCash and Mercurygradual
- 2026-11-12 (approx.)ESS Tech · Q3 2026 results: cash, first Bridge orders and any binding Alsym agreementgradual
- 2026-11-12 (approx.)Flux Power · Q1 FY2027 results: revenue, gross margin and liquiditygradual
- 12 Nov 2026Greenlane Renewables · Q3 2026 results with order backlog and order intakegradual
- 12 Nov 2026Lifecare · Q3 report: cash, burn and update on productiongradual
- 12 Nov 2026Questerre Energy · Q3 2026 results: shows whether sales in Brazil have reached the contract minimum, and whether the inventory of 40,000 barrels has been soldgradual
- 2026-11-12 (estimated)Rekor Systems · Q3 report: test of the target of positive adjusted EBITDA in H2 2026gradual
- 12 Nov 2026Vistagen · Q2 FY2027 report: cash at 30/9, burn and any update on the FDA meetinggradual
- 12 Nov 2026VolitionRx · Q3 report: cash after the Lind prepayment and financinggradual
- 13 Nov 2026AEON Biopharma · Q3 report with cash and runway after the July issuegradual
- 13 Nov 2026Episurf · Q3 report: first quarter with KlaraBo, Livi, Lilium and Setune; NAV per share after dilutiongradual
- 13 Nov 2026Excellon Resources · Q3 2026 report (estimated) – first concentrate sales and cash balancegradual
- 13 Nov 2026Global Atomic · Q3 results (estimated date) – cash, capex burn and status of DFC conditionsgradual
- 13 Nov 2026Gunnison Copper · Q3 2026 results (estimated) – first quarter with commercial production at Johnson Campgradual
- 13 Nov 2026HydrogenPro · Q3 report: cash, burn and status of the strategic reviewgradual
- 13 Nov 2026IRLAB Therapeutics · Q3 reportgradual
- 13 Nov 2026Laramide Resources · Q3 report (estimated date) – cash after the placementgradual
- 13 Nov 2026PetroTal · Q3 2026 report (estimated date) – production, cash and possible dividend signalgradual
- 2026-11-13 (approx.)Prairie Operating · Q3 2026 results: first quarter under the new minimum production covenant; August production was approx. 27,000 boe/dgradual
- 13 Nov 2026Precise Biometrics · Q3 2026 report: first quarter with Fingerprint Cards consolidated, cash after the issue and synergy statusbinary
- 13 Nov 2026Touchstone Exploration · Q3 2026 results (estimated) – first quarter with full compressor effect; status of covenant waiver and going concernbinary
- 13 Nov 2026Volatus Aerospace · Q3 2026 results (estimated date) – shows whether the postponed defence order of approx. 2.6m C$ has been deliveredgradual
- Nov 2026KALA BIO · Due diligence on the telehealth acquisition is completedbinary
- Nov 2026Metacon · CFO Mattias Jansson is stepping downgradual
- Nov 2026OHLA · Q3 2026 report: whether the margin improvement in construction (7.3% EBITDA margin) holds, and whether the cash flow continuesgradual
- 2026-11 (estimated)Patagonia Gold · Q3 2026 report – first full quarter of ramp-up at Calcatreu (production, sales, debt)gradual
- Nov 2026PyroGenesis · Q3 2026 results (Q3 2025 came in November) – shows whether revenue growth and the lower loss hold, and how liquidity is after the July maturitygradual
- Nov 2026Sernova · Shareholder meeting and closing of the merger of Seraxis into BetaNova Biotherapeutics (requires 2/3 majority, court and TSX approval); Sernova shareholders get about 50%binary
- Nov–Dec 2026Vantiva · Move of the listing to Euronext Growth (at the earliest two months after 23/9-2026, requires Euronext's approval)gradual
- 2026-11-16 (approx.)Datavault AI · Q3 2026 results: test of guidance of approx. 200m USD for 2026 after 10m in H1binary
- 2026-11-17 (approx.)Canaan · Q3 2026 results: guidance is only 11–15m USD in revenue; focus on cash and burngradual
- 2026-11-17 (approx.)XCF Global · Q3 2026 results: first quarter with BGN deliveries (over 10m USD in August)gradual
- 18 Nov 2026Bluelake Mineral · Q3 report (estimated date): cash after the issue, drilling results at Joma/Gjersvik and timeline for the PFSgradual
- 18 Nov 2026KALA BIO · Q3 reportgradual
- 19 Nov 2026BioPorto · Q3 report: NGAL growth after recall and cash balancegradual
- 19 Nov 2026Elliptic Labs · Q3 2026 report: does revenue show that the laptop contracts exceed the minimum thresholds?binary
- 2026-11-19 (approx.)Evogene · Q3 2026 results: cash burn and any paid ChemPass agreementsgradual
- 19 Nov 2026Scandinavian Medical Solutions · Annual report 2025/26: actual EBITDA vs −9 to −13m, inventory value, writedowns and expectations for 2026/27gradual
- 20 Nov 2026Desert Control · Q3 2026 report: first evidence of whether guidance of about USD 2m for 2026 holdsbinary
- 20 Nov 2026Initiator Pharma · Q3 report with status of recruitment for the vulvodynia study and cashgradual
- 20 Nov 2026Premier American Uranium · Q3 report (estimated date) – cash after the drilling seasongradual
- approx. 2026-11-24Danish Aerospace · Q3 update: liquidity, whether the postponed orders have come in, and whether guidance (18–20m DKK) holdsbinary
- 24 Nov 2026SBB · Q3 2026 report: LTV, refinancing of the 13% preferred shares and plan for 2027 maturitiesgradual
- 24 Nov 2026Silver Storm Mining · Report for the quarter to 30/9/2026 (estimated) – first sales from the oxide and sulphide circuit and new cash balancegradual
- 25 Nov 2026Cantargia · Q3 report: cash after the share issue and update on the MDS/AML studygradual
- 25 Nov 2026Lahontan Gold · Q3 report (estimated date) – cash and burngradual
- 25 Nov 2026Norse Atlantic · Q3 2026 report (summer quarter): cash, fuel costs and status of the strategic reviewgradual
- 25 Nov 2026Nykode · Q3 report: update on recruitment in Abili-T and booking of the lost tax casegradual
- 26 Nov 2026ADLER Group · Q3 2026 results: portfolio valuation, LTV and progress in salesgradual
- 26 Nov 2026K33 · Q3 2026 report: liquidity, bitcoin holdings and whether the MiCA expansion gives volumebinary
- 26 Nov 2026Spanish Mountain Gold · Q3 report (estimated date) – cash and burngradual
- 2026-11-27 (estimated)Defense Metals · Q2 FY2027 results (to 30/9) – cash and status of the DFSgradual
- 27 Nov 2026Elicera Therapeutics · Q3 report and updated follow-up on durability of responders in phase 1gradual
- 27 Nov 2026Enviro · Expiry of the requested extension of the restructuringbinary
- 27 Nov 2026Guanajuato Silver · Q3 2026 report (estimated date) – margin, cash and AISC after record capexgradual
- 2026-11-27 (estimated)HPQ Silicon · Q3 2026 results – shows whether new capital has been raised, and how the HSPI transaction is bookedgradual
- 27 Nov 2026Purepoint Uranium · Q3 report (estimated date) – cash and financing needgradual
- Q4 2026–Q1 2027 (no date)Acarix · New capital raise needed, as cash lasts about 7 monthsbinary
- Q4 2026AEON Biopharma · IND submission for the CMAP pharmacodynamics study in healthy volunteersgradual
- Q4 2026Akobo Minerals · Vertical shaft reaches first lateral level – target of 50 kg/month (about 5x current)gradual
- by about 2026-11-28 at the latestAtlantic Sapphire · Compulsory redemption of minority shareholders, expected at the offer price of NOK 0.80 (the offer period ended 28/8-2026; a price equal to the offer applies for redemption within 3 months)binary
- after compulsory redemption (Q4 2026)Atlantic Sapphire · Delisting from Oslo Børsbinary
- Q4 2026aTyr Pharma · Start of study activities for the new phase 3 study in pulmonary sarcoidosis (FVC endpoint)gradual
- Q4 2026BioPorto · Target of 60 US hospitals in the RUO programme by end-2026 (54 at end of Q2)gradual
- Q4 2026Brunswick Exploration · Assays from the summer drilling at Mirage (about 4,000 m along MR-1 and MR-4), announced 'in the coming weeks'gradual
- Q4 2026Brunswick Exploration · Assays for the 202 m wide spodumene intercept in the Anais dyke at Anatacau Main (today only a visual estimate)binary
- Q4 2026CanAlaska · Assay results from the 2026 summer drilling at West McArthur (step-outs along the C10S corridor from Pike Zone; the programme ended in September)binary
- Q4 2026Cassiar Gold · Assay results from the 2026 drilling campaign (7,400 of 10,000 m drilled at Taurus and Newcoast as of 17/9)gradual
- Q3–Q4 2026 (no fixed date)Crunchfish · Board decision on CBDC in the Caribbean (expected in Q3) and first commercial agreement with revenue, which the CEO expects 'this year'binary
- Q4 2026–Q1 2027Crunchfish · Financing needed: strategic investor or new issue, as cash lasts until about March 2027binary
- Q4 2026 – H1 2027Deoleo · The Spanish government's approval or blocking of a foreign takeover (investment screening)binary
- Q3–Q4 2026Desert Control · Conversion of 42 pilot trials in California (agriculture and golf) into commercial contractsgradual
- Q4 2026Dicot Pharma · Decision on the EU application (CTA) for phase 2bbinary
- Q4 2026District Metals · New Swedish government after the election 13/9-2026 - its line on uranium mining, alum shale and the removed municipal vetobinary
- Q4 2026 (early)Ebusco · Extraordinary general meeting: change of auditor from EY to CFA and Rhein Holding's seat on the supervisory boardgradual
- Q4 2026Elicera Therapeutics · Start and first patients in phase 2a of CARMA (ELC-301) after the Swedish Medical Products Agency's approval in September 2026gradual
- Q4 2026Emerita Resources · Publication of the PFS for Iberian Belt West (NPV, IRR, capex) - 'in the coming weeks' after extended reviewbinary
- Q4 2026Ensurge Micropower · Possible signing of a multi-phase development agreement with a large external customer ('in the final stage' at 31/7/2026)binary
- Q4 2026F3 Uranium · 1:10 consolidation of the shares once TSXV accepts it (631.8m to approx. 63.2m shares)gradual
- Q4 2026F3 Uranium · Remaining results from the 2026 summer programme (about 4,000 m; the A4 conductor, Broach Lake, JR's south-eastern extension and the Tetra area)binary
- Q4 2026Flux Power · Waiver/amendment of the Gibraltar credit line and requirement of USD 4m in new equitybinary
- Q4 2026GenSight Biologics · Meeting with the FDA on the final RECOVER protocol; last patient in the dose study REVISE (December)binary
- Q4 2026Gunnison Copper · Preliminary column leach results from the Gunnison project (recovery and acid consumption)binary
- Q4 2026KALA BIO · Nasdaq Hearings Panel decides whether the share can remain listed (no cure period)binary
- Q4 2026Lahontan Gold · Completion of the Emergent Metals acquisition (court-approved plan of arrangement) and drilling results from West Santa Fe (rig mobilized 21/9-2026)gradual
- Q4 2026Leclanché · SIX's reaction to the missed final deadline: continued suspension, sanction or delistingbinary
- Q4 2026Lucara Diamond · Open pit mine ending; transition to processing stockpiled oregradual
- Q4 2026 – Q1 2027Minesto · Capital raise necessary (amount and form unknown)binary
- Q4 2026Nordic Mining · Resolution of the dispute over Barton's termination of the garnet offtake agreementbinary
- Q4 2026Nykode · Possible repair issue at NOK 4.40 for shareholders who did not receive an allocationgradual
- Q4 2026Observe Medical · Target of positive operating cash flow; if not reached, new financing is required (going concern qualification)binary
- Q4 2026 (ongoing)Oroco Resource · Remaining phase 2 analyses from South Zone and start of drilling in Pillar Zonegradual
- Q4 2026PetroTal · Results from well 25H, the first of eight new wells at Bretaña (drilled from 21/9/2026)binary
- Q4 2026Photon Energy · New vote among the bondholders on a joint representative and an independent business review, then a concrete restructuring proposalbinary
- Q4 2026Premier American Uranium · More drilling results from Kaycee (Rustler/Outpost) in cycles of about 6 weeks; 50 of the planned holes had been drilled by mid-Augustgradual
- Q4 2026Purepoint Uranium · Assay results from the 2026 summer programme at Nova (hole NV26-11: 5.6 m continuous radioactivity, peak 53,300 cps; laboratory results awaited)binary
- Q4 2026Salmon Evolution · First harvest from phase 2 (Indre Harøy) and handover of the last 8 of 12 growth tanks during 2026gradual
- Q4 2026 (report approx. Feb. 2027)Senzime · The company's target of profitability in Q4 2026binary
- Q4 2026Silver Storm Mining · Transition from stockpile to underground ore (Quebradillas and Rosarios) and stable operation of the sulphide circuit at 1,250 t/dgradual
- Q4 2026Southern Silver · Updated resource estimate with Puro Corazon (planned for Q3 2026)gradual
- Q4 2026Spanish Mountain Gold · Completion of the 60,000 m drilling program for the feasibility study (31,587 m done) and a draft detailed project description for the environmental assessmentgradual
- Q4 2026 (ongoing)Sun Summit Minerals · Assay results from 55 holes (over 16,000 m) on the Creek, Finn and Schmitt zonesbinary
- Early in Q4 2026Sun Summit Minerals · Metallurgical report for the JD projectgradual
- Q4 2026–2027Techstep · Strategic review after the issue, which may lead to delisting or structural changesbinary
- Q4 2026 – Q1 2027Tessellis · End of the 'composizione negoziata' (typically 180 + 180 days from the start in spring 2026): restructuring agreement, composition with creditors or liquidation – determines whether shareholders get anythingbinary
- Q4 2026Tobii · Outcome of strategic review: divestment/partnership in Autosense or capital raisebinary
- Q4 2026Touchstone Exploration · Results from the two-well oil campaign at WD-4 (first well started mid-September 2026; second well paid for by the drilling contractor)gradual
- Q4 2026 (no fixed date)Tullow Oil · Agreement with Ghana's government on paying the tax bill of up to USD 393m – determines liquiditybinary
- Q4 2026Viaplay · Completion of the sale of Holland (142 m EUR) – net debt falls about 30%gradual
- Q4 2026Volatus Aerospace · Delivery of the first 100 tactical ISR drones to the Canadian Armed Forces; then options for up to 4,900 more systems (framework max. C$25m over 5 years)gradual
- 30 Nov 2026aTyr Pharma · Nasdaq deadline to reach USD 1 – reverse split or delistingbinary
- 30 Nov 2026Hilbert Group · Q3 report: fee income, effect of the savings, cash and use of the LDA facilitybinary
- 7 Dec 2026XCF Global · Nasdaq's deadline to regain USD 1 – reverse split or delistingbinary
- 9 Dec 2026Scandinavian Medical Solutions · General meeting (possible authorization for capital increase)gradual
- 14 Dec 2026Risanamento · General meeting (2nd call 15/12) – possible capital increase or measures under art. 2446/2447binary
- Dec 2026–Mar 2027Beowulf Mining · ISP decision on the Bacchus investment (review started 10/9, up to 3–6 months)binary
- latest about December 2026Nel · New CEO (Volldal stepped down with six months' notice in June)gradual
- 15 Dec 2026Rekor Systems · Maturity of the 15 m USD Series A Prime Revenue Sharing Notes (13.25%) – refinancing or issuebinary
- Dec 2026VolitionRx · Monthly repayments on the Lind loan from 2026 begin (probably in shares)gradual
- Dec 2026Zenith Energy · Half-year report at 30/9-2026 (latest end of December) with status on cash, bond maturity and the Daybreak acquisitiongradual
- 17 Dec 2026CanAlaska · Quarterly report (estimated date) - cash after the summer programgradual
- 18 Dec 2026DMG Blockchain · Annual accounts 2025/26 (Q4) with bitcoin holdings and debtgradual
- 18 Dec 2026Emerita Resources · Annual accounts for financial year 2026 (estimated date) – cash and financinggradual
- 18 Dec 2026Mega Uranium · Annual accounts for the financial year to 30/9-2026 (estimated date) – updated portfolio and debtgradual
- 22 Dec 2026Heron Therapeutics · Nasdaq deadline to reach USD 1; otherwise application for 180 more days in exchange for a reverse splitbinary
- 2026-12-23 (estimated)Focus Graphite · Annual accounts FY2026 (to 30/9) – cash, going concern and warrant statusgradual
- 29 Dec 2026Prairie Operating · Nasdaq's deadline to regain USD 1 (extension or reverse split)binary
- 2026–2027 (ongoing)ADLER Group · Further sales of projects and properties to repay 1L New Money debt (EUR 201m so far in 2026)gradual
- 2026 (no date)Alligator Bioscience · Sale or licence of mitazalimab, which the company will try in 2026binary
- Turn of the year 2026/27Alzinova · First patient in the global phase 2 of ALZ-101 (about 120 patients)gradual
- 31 Dec 2026Beowulf Mining · Extended deadline in the settlement agreement with Alumni Capitalbinary
- 2026–2027Capsol Technologies · Conversion of MoU with a US utility (CapsolGT for gas power) and about 150 gas turbine leads into paid projectsbinary
- 2026–2028Clavister · Delivery of the SEK 642m order book (defense) and new call optionsgradual
- 2026–2027Danish Aerospace · Orders for E4D training equipment and medical equipment for commercial space stations that are to replace the ISSbinary
- 2026–2027Danish Aerospace · Development of the ESA motion capture system (space and defence) and possible first defence orders after the name changegradual
- Oct. 2026Defense Metals · Closing of the placement of up to C$6m at C$0.14 with a lead order from the chairmangradual
- 2026–2027District Metals · Drilling programme of 5,000–7,000 m at Viken and the alum shale properties (depends on drilling permits) to convert inferred to indicatedgradual
- Not set (after Sep. 2026)Emerita Resources · TSJA's ruling in the administrative case on the Aznalcóllar tender; the suspension was lifted in September 2026binary
- no date (autumn 2026)Evogene · Special takeover offer from Pure Capital/Invest Pro and clarification of the contested general meeting – may change board and strategybinary
- End of 2026Excellon Resources · 400 ramp completed and updated mine plan with a timetable for 600 t/dgradual
- Winter 2026/27F3 Uranium · First drilling season under new CEO Ross McElroy (former CEO of Fission Uranium, which was sold to Paladin for 1.14 bn C$)gradual
- Ongoing 2026-2027Ferrexpo · Resumption of VAT refunds (102 m USD receivable) and return of more pellet lines; a ceasefire in Ukraine would be the big gradual drivergradual
- H2 2026Ferroamp · The company's target of positive EBITDA per monthbinary
- 2026–2027Ferroamp · Rollout via Aira in Germany, Italy and the UK and via Vattenfall and Elvy in Swedengradual
- Oct. 2026Focus Graphite · Canada Investment Summit with Prime Minister Carney, where Lac Knife is included in the 'Investment Deal Book' – possible contact with strategic investorsgradual
- End of 2026Greenlane Renewables · Cascade LF production-ready via Panasonic in São José dos Campos, Brazil (landfill gas)binary
- End of 2026Gunnison Copper · Johnson Camp at nameplate (25m lbs/year) and approval of the Mined Land Reclamation Plangradual
- No date (2026–2027)Hexagon Purus · 'Structural measures' for the convertible bonds – decide how much of the company shareholders keepbinary
- Undated (applied July 2026)Hilbert Group · Decision on MiCA and payment license in Maltabinary
- late 2026Hofseth BioCare · Planned FDA IND application for FT-002a-O (AecorBio)gradual
- No date given (negotiations resumed Sept. 2026)HPQ Silicon · Possible binding agreement on a 1,000 t/year fumed silica plant or with a global fumed silica producerbinary
- monthly from 2026Hyperscale Data · Monthly status reports on the Michigan AI data centre and start-up of the first 20 MW under the master services agreementgradual
- end of 2026Initiator Pharma · Topline data from phase 2a with pudafensine in vulvodynia (24 women, placebo-controlled crossover)binary
- 2026 (rest of the year)Innoviz · Target of 2–3 new programme wins (automotive, robotaxi via Mobileye, Perciz defence)binary
- 2026 (company target, no exact date)IRLAB Therapeutics · Partner or licence agreement funding phase 3 for mesdopetam (Parkinson's dyskinesia)binary
- 2026–2027K33 · European expansion after MiCA license (passport to SE, DK, FI and DE) and new institutional partners such as Coinmotiongradual
- Not set ('soon to be completed' as of Aug. 2026)Lahontan Gold · Updated PEA for Santa Fe with the new resource of 2.39 Moz AuEq and phase 2 sulphide processingbinary
- autumn 2026Lifecare · 'Controlled manufacturing' established at Ocean TuniCell's premises in Bergengradual
- 31 Dec 2026Lion One Metals · Deadline for repayment/refinancing of the Nebari loan (about 31.2 m US$) under the forbearance agreementbinary
- 2026–2028Mega Uranium · Construction of NexGen's Rook I (licence granted 5/3-2026, valid to 2036) – progress and financing drive the main assetgradual
- End of 2026Mereo BioPharma · Update from FDA/MHRA on a possible path for setrusumab in children with osteogenesis imperfecta (FDA open to alternative fracture analysis)binary
- 2026 (ongoing)Midsummer · Delivery and revenue recognition of most of the SEK 236m ordergradual
- Ongoing 2026-27MindMaze Therapeutics · The reimbursement studies SwissNeuroRehab (Switzerland) and REACT-AVC (France) and rollout via Vibra Healthcare in the USAgradual
- 2026–2027Minesto · The EIB-backed investment case for the first tidal farm (Dragon Farm) in the Faroe Islands – a funded farm would be the first commercial breakthroughbinary
- The 2026–27 season (southern summer)Mogotes Metals · Up to 20,000 m of drilling at Filo Sur: expansion of Albor and Cruz del Sur and first porphyry tests at Luz del Sol-Cuenca and Mesetabinary
- autumn 2026Nel · The EU's delegated acts on qualifying hydrogen (postponed from July)binary
- before the end of 2026Norse Atlantic · Completion of the strategic review with J.P. Morgan (sale, merger or partnership); several parties have signed confidentiality agreementsbinary
- 2026–2027Oncopeptides · Launch in Central and Eastern Europe via Salus (11 countries; list price in Slovenia has been set)gradual
- 2026 (no date)Path2 Hydrogen · Capital increase via authorized capital and new shareholder loansbinary
- 2026–27Pharol · First investments or new strategy under chairman João Moreira Rato (approved by the ECB on 17/8-2026, mandate to 2028)gradual
- Turn of the year 2026/27PILA PHARMA · Result of part 1: safety and tolerability at high doses plus the first weight databinary
- no date (autumn 2026)Prairie Operating · Borrowing base redetermination on the credit facility (USD 475m, 436m drawn) and refinancing of the remaining Series Fbinary
- 2026–2027Precise Biometrics · Realisation of at least 45m SEK of annual cost synergies (primarily in 2026)gradual
- autumn 2026Realbotix · Launch of new robot line: tabletop model at about USD 12,000 and full size at about USD 55,000gradual
- End of 2026Sintana Energy · High-impact exploration well on PEL 90 (Namibia), Sintana fully fundedbinary
- Undated (announced August 2026)Smoltek · 3,000-hour durability test of electrolysis electrodes with Heraeusbinary
- Ongoing 2026Southern Silver · Drill results from Cerro Las Minitas and Puro Corazon (latest 35.0 m at 399 g/t AgEq 21/9-2026)gradual
- No date (decree sent to the Conseil d'État 2/7-2026)Stenocare · French decree on price and reimbursement for medical cannabis is adopted, so ASTRUM 10-10 can apply for accessbinary
- October 2026Touchstone Exploration · Workover of Cascadura-3ST1 and recompletion of Cascadura-5 (after a successful solvent squeeze on Cascadura-2ST1)gradual
- 2026-2027OHLA · Refinancing of the 9.5–9.75% bonds at a lower rate (planned new bond) – will lift net income markedlygradual
- 2026-2027Silver Storm Mining · Drill results from surface and underground drilling at La Parrilla financed by the Sprott issuegradual
- 4–18 Jan 2027Alzinova · Exercise of TO5 at SEK 0.50 (up to SEK 81m)binary
- 8–22 Jan 2027Alligator Bioscience · Exercise of TO15 (up to 1.47bn shares, max. SEK 29.4m)binary
- 11 Jan 2027Canaan · Nasdaq's deadline to regain USD 1; requires a reverse split, otherwise delistingbinary
- Jan–Feb 2027Maisons du Monde · Revenue for 2026 (incl. Christmas trade) - shows whether the decline stops under the new ownersgradual
- Jan 2027Questerre Energy · Hearing on objections in the constitutional case against Quebec's revocation of the licences (the attorney general's reply was set for September 2026)gradual
- 18 Jan – 15 Feb 2027Smoltek · Pricing and exercise of TO 9 (48–68m SEK, only if the price is above approx. 2.19 kr) and deadline for conversion of the convertible loan 31/1binary
- 19 Jan 2027SunPower · Nasdaq deadline to reach USD 1; otherwise application for 180 more days in exchange for a reverse splitbinary
- 2027-01-20 (approx.)Flux Power · Nasdaq's deadline to regain USD 1binary
- 25 Jan 2027Context Therapeutics · Nasdaq deadline to reach USD 1 (possible 180-day extension)binary
- 27 Jan 2027Cassiar Gold · Annual accounts for financial year 2026 (estimated date) – cash and spendinggradual
- 1 Feb 2027Vistagen · Nasdaq deadline to reach USD 1; reverse split or delistingbinary
- 2027-02 (H2 report, expected approx. 27/2 as in 2026)Observe Medical · Full-year 2026 figures: sales, cash and new covenant with Innovation Norwaygradual
- 2027-02 (Q4 report)OssDsign · Full-year 2026 figures and any targets for 2027 under the new managementgradual
- 16 Feb 2027KebNi · Annual accounts 2026: first year after the issue and the doubling of IMU capacitygradual
- 16 Feb 2027Mereo BioPharma · Nasdaq deadline to reach USD 1 (change of ADS ratio expected)binary
- 22 Feb 2027Datavault AI · Nasdaq's deadline to regain USD 1 – reverse split or delistingbinary
- Q1 2027AEON Biopharma · Start of the CMAP study (milestone that may trigger milestone warrants)gradual
- Q1 2027aTyr Pharma · Topline data from the phase 2 study EFZO-CONNECT in SSc-ILD (lung disease in systemic sclerosis)binary
- Q1 2027Cantargia · Start of phase 1b study with nadunolimab + daraxonrasib (RAS inhibitor) in pancreatic cancer at US clinics; first data 9–12 months latergradual
- Q1 2027Context Therapeutics · Start of phase 1b dose expansion with CTIM-76 in platinum-resistant ovarian cancergradual
- Q1 2027Desert Control · Full-year 2026 figures vs guidance and the new burn level after the share issuegradual
- End of 2026 / Q1 2027Excellon Resources · Updated resource estimate for Mallay with deeper drilling (below the 4090 level)gradual
- Q1 2027GenSight Biologics · Structural financing must be in place before March 2027; new GMP batch released in March 2027binary
- Q1 2027IRLAB Therapeutics · CEO Kristina Torfgård steps down; new CEOgradual
- Late 2026 or Q1 2027KALA BIO · Definitive agreement and closing of the telehealth acquisition (about USD 15m, cash and shares)binary
- Q1 2027 (March)Latecoere · Annual accounts 2026: shows whether the aerostructure loss has turned and whether FCF holdsgradual
- Q1 2027Sernova · First patients dosed in the FDA-approved phase 1/2 with SR-02 (stem cell-based islet cells, NCT07581197) and planned Nasdaq listing of BetaNovagradual
- Q1 2027Spanish Mountain Gold · Formal submission of the detailed project description in the resumed BC/federal environmental assessmentgradual
- Q1 2027Sun Summit Minerals · First NI 43-101 resource estimate for JDbinary
- Q1 2027Zenith Energy · The ICSID tribunal's award in the case against Tunisia (claim about US$572.65m) after the hearing in Paris in April 2026 and final written submissions in September 2026binary
- Mar 2027Casino · Maturity of the Term Loan B of 1.4 bn EURbinary
- By 2027-03-22 at the latestInnoviz · Reverse split (approved 1:5–1:20) to reach USD 1 before the Nasdaq deadlinebinary
- 29 Mar 2027Evogene · Nasdaq's extended deadline to regain USD 1 (reverse split 1:2–1:15 approved)binary
- H1 2027Lifecare · New funding required (runway into Q2 2027)binary
- H1 2027Nykode · Selection of first lead programme on the tolerance platformgradual
- H1 2027PILA PHARMA · Financing of part 2 (38 participants), probably an issuebinary
- H1 2027Premier American Uranium · Updated PEA for Cebolleta after Hazen's 42-week metallurgy programme; 90% recovery instead of 80% could lift NPV from approx. $84m to approx. $160mbinary
- May 2027Dicot Pharma · Exercise of TO 7 warrants (about 365m)gradual
- May 2027Norse Atlantic · Maturity of the secured facility of 52 m USD (15% interest)binary
- Q2 2027Context Therapeutics · First safety and efficacy data for CTIM-76 given every third weekbinary
- around Q2 2027Medivir · FLEX-HCC fully enrolled (plan: all patients within 12 months from May 2026)gradual
- by 2027-06-13 at the latestPremier American Uranium · Closing of the Colorado sale to DISA (DOE review) and release of US$5m from escrowbinary
- Jun 2027Tessellis · Canarbino's lease agreement for B2C expires (12 months from 1/6-2026, possibly +3 months); final purchase at EV EUR 27m plus earn-outbinary
- after 2027-07-30Maisons du Monde · The consortium's commitment not to seek delisting expires - possible buyout of the last 4.8% (price unknown)binary
- 6 Aug 2027VolitionRx · Deadline to regain NYSE American compliance (equity)binary
- 19 Aug 2027Ebusco · Maturity of the extended Heights loanbinary
- by 2027-08-21 at the latestK33 · Exercise window for Sixty Six Capital's call option on 100–200 BTC at USD 100,000; the bitcoin price drives K33's look-through exposurebinary
- 31 Aug 2027Ensurge Micropower · Mandatory conversion of convertible loans of NOK 80m plus PIK interestgradual
- By 2027-09-30 at the latestQuesterre Energy · Milestone for PX Energy: FCF of US$30m, which triggers contingent consideration shares and shows whether the acquisition holds upgradual
- 30 Sep 2027Tullow Oil · Deadline for a binding sales agreement for the assets; otherwise the maturity of the 2028 bonds is brought forward to 15/5-2028binary
- 1–15 Oct 2027Bluelake Mineral · Exercise of TO7:1 at SEK 1.70: gives up to approx. SEK 70m if the share price is above strike, and otherwise a new funding gapbinary
- H2 2027GenSight Biologics · Planned start of the phase III RECOVER study (subject to funding)gradual
- H2 2027Lucara Diamond · The first underground development ore replaces stockpiled orebinary
- By about 2027-11 at the latestMogotes Metals · Expiry of Rio Tinto's 15-month exclusivity on Filo Sur (can be extended 6 months) – possible project agreement, acquisition or step-up to 9.99%binary
- Nov 2027Photon Energy · Maturity of the green bond 2021/2027 (78.8 m EUR)binary
- 30 Nov 2027Cereno Scientific · Maturity of the SEK 175m convertible (conversion at SEK 10 or repayment)binary
- 2027AEON Biopharma · Back to the FDA with a combined evidence package before BLA (351(k))binary
- 2027BioPorto · Recruitment and results in the adult validation study for ProNephro AKI (about 900 patients) and new financinggradual
- Winter 2027CanAlaska · First drilling season under new exploration director James Sykes (project leader at NexGen's Arrow discovery in 2014), appointed 21/9-2026gradual
- 2027Cantargia · Phase 2a data for nadunolimab + azacitidine/venetoclax in high-risk MDS/AML (about 40 patients; 5/5 complete remission in phase 1b)binary
- 2H 2027Context Therapeutics · First phase 1a data for CT-202 (Nectin-4 x CD3) in bladder, bowel and triple-negative breast cancerbinary
- 2027DMG Blockchain · Energization of the first phase of the AI data center at Christina Lake (postponed from 31/12-2026)binary
- Undated (expected before energisation in 2027)DMG Blockchain · Definitive 12-year agreement for 50 MW of AI colocation with an anonymous tenant with an investment-grade guaranteebinary
- 2027Elicera Therapeutics · Start of phase 1/1b with ELC-401 (iTANK-CAR-T against glioblastoma)gradual
- 2027Elliptic Labs · First revenue from wearables/smart glasses and the Edge AI platform (commercial discussions under way)gradual
- 2027Hyperscale Data · Planned spin-off of ACG (Ault Capital Group) to shareholdersbinary
- 2027Intrum · Refinancing of new money notes (maturing Dec. 2027) and first exchange notes – test of market access after Chapter 11binary
- Mid-2027IRLAB Therapeutics · First results from LIFT-PD (phase 1b, linepemat/IRL757 for apathy in Parkinson's, Otsuka-funded)binary
- 2027Lahontan Gold · Mine Plan of Operation (BLM) and state permits; construction start targeted for 2027binary
- Early 2027Mereo BioPharma · Possible start of global phase 3 for alvelestat and Sentynl's decision to exercise the option (USD 40m)binary
- 2027Nykode · First interim analysis in the randomised phase 2 Abili-T (abi-suva, HPV16+ head and neck cancer) at about 1/3 of patientsbinary
- 2027Nykode · Reopening at the Tax Appeals Board or a lawsuit over NOK 325mbinary
- 2027Oncopeptides · Target of positive cash flow during the year – or new financing if it slipsgradual
- 31 Dec 2027Patagonia Gold · Maturity of the Cantomi loan (about US$50 m incl. interest) – extension, conversion or refinancingbinary
- Mid-2027PetroTal · Target of restoring production to approx. 20,000 barrels/day after the 8-well programme; reinstating the dividend depends on itgradual
- summer 2027 (analyst estimate)PILA PHARMA · Result of part 2 of PP-CT04 with weight change after 12 weeks vs placebobinary
- Winter 2027Purepoint Uranium · JV budget and winter drilling at Dorado with IsoEnergy as well as partner-funded programs with Cameco and Oranogradual
- Mid-2027Salmon Evolution · Targeted run-rate of 14,600 tons HOG per year (vs guidance of approx. 6,000 t in 2026)gradual
- 2027SBB · Senior bonds of SEK 6.0bn fall due (21.3bn in 2027–2029); decides whether SBB can refinance in the market or must sell/dilutebinary
- Mid-2027Sernova · First data from the SR-02 trialbinary
- 2027Sintana Energy · Chevron's high-impact well on PEL 82 (fully carried)binary
- H1 2027Southern Silver · Updated PEA for the combined Cerro Las Minitas project – with higher metal prices NPV could rise markedly from US$501mbinary
- 2027Tobii · Target of sustained positive operating cash flow from 2027, carried by Autosensegradual
- 2027Tullow Oil · First hearing in the second ICC tax case (interest expenses, 190.5 m USD)binary
- 2027 (no fixed date)Vantiva · General meeting on possible convertible bondbinary
- Approx. March 2027Verimatrix · Annual accounts 2026: does it reach the Anti-Piracy EBITDA target of at least USD 3m, and does revenue return to growth?gradual
- FY2027Xtract One · Installation of C$27.2m in agreements awaiting installation – must be converted into revenue and subscriptionsgradual
- Q1 2028Hexagon Purus · Maturity of the first convertible loanbinary
- Q1 2028Salmon Evolution · Repayments on the bank facility (DNB/Nordea) begingradual
- By 2028-03-31 at the latestFocus Graphite · Completion of the NRCan-backed demonstration plant for thermal purification (ultra-pure graphite for batteries and defense)gradual
- H1 2028Gunnison Copper · PFS for the Gunnison project and changed key permitsgradual
- H1 2028Lucara Diamond · Full underground production at Karowegradual
- H1 2028Spanish Mountain Gold · Feasibility study and construction decision (company target)binary
- Jun 2028Kongsberg Automotive · EUR 110m bond matures - possible early refinancing at a lower rate; target of 6.5% EBIT margingradual
- Jun 2028Viaplay · Maturity of 6.9 bn SEK in loans and MTNbinary
- 1–15 Jul 2028Bluelake Mineral · Exercise of TO7:2 at SEK 1.87gradual
- Q4 2028Cereno Scientific · Topline from phase 2b EPIMODE with CS1 in PAHbinary
- Dec 2028ADLER Group · First large bond maturity (after the extensions to Dec 2028, Dec 2029 and Jan 2030)binary
- Mid-2028BioPorto · Expected FDA approval of ProNephro AKI for adultsbinary
- H2 2028Global Atomic · Commissioning of the process plant and first yellowcake from Dasabinary
- 2028Intrum · Target of servicing gearing of 3.0x and up to SEK 7bn of extra portfolio investments 2026–2028gradual
- No dateAccuray · Samsung collaboration on volumetric imaging for CyberKnife (non-binding LOI)gradual
- no date from HenliusAlligator Bioscience · Data from Henlius' global phase 3 with HLX22 in first-line HER2+ gastric cancer (milestones to AbClon, of which Alligator gets 35%)binary
- no date from the companyAlzinova · Fujirebio is assessing a broader collaboration on a blood-based Alzheimer's test after the completed Amsterdam UMC studybinary
- no date from the companyAscelia Pharma · Partnership agreement on Orviglance and financing needed within about 2 quartersbinary
- No dateCantargia · Possible milestone payments from Otsuka for CAN10 (up to USD 580m in total)binary
- OngoingCanaan · The bitcoin price: drives machine sales, own mining (243 BTC in Q2) and the value of the 1,915 BTC holdinggradual
- no date (awaiting regulatory approval)Datavault AI · Closing of the BankWyse acquisition (digital asset custody) and integration of NYIAXgradual
- No date givenDefense Metals · NRCan decision on up to C$32m for the feasibility program for the concentrator and hydrometallurgybinary
- Not disclosed (the company only reports on the final outcome)Diamyd Medical · Outcome of strategic review: sale/out-licensing of retogatein, sale of the Umeå factory or a transaction with one of the shortlisted counterpartiesbinary
- No dateEbusco · LC facility of about EUR 30m with Asian partner and Gotion guaranteebinary
- No dateEbusco · Strategic transaction: sale of a controlling stake in the bus division or JVbinary
- no date from the companyElicera Therapeutics · Possible non-exclusive licence agreement for iTANK with a CAR-T companybinary
- No dateEnviro · The arbitration case with Infiniteria over the joint venture terminations and the licence rightsbinary
- Unresolved (appeal pending)Ferrexpo · Bankruptcy petition against the operating company FPM and the state's claim to 49.5% of FPM via ARMA - decides whether shareholders keep the assetbinary
- No date givenGlobal Atomic · Fulfilment of DFC's five conditions (export route, extended mine convention, repatriation guarantee, agreement with the state, final loan documentation) and possible sale of a minority stake to the JV partnerbinary
- OngoingGreenlane Renewables · New orders for Cascade H2S desulfurization and upgrading plants (latest C$2.5m 19/8-2026)gradual
- no dateGuanajuato Silver · Restart of mining at VMC once a high-margin life-of-mine plan is in placegradual
- No dateHeron Therapeutics · Clarification of the timing of generic CINVANTI after the ruling in June 2026binary
- No dateHeron Therapeutics · Outcome of the review of strategic alternatives (sale, merger or refinancing)binary
- After the first batch (date not stated)HPQ Silicon · STAT's field evaluation (RETEX) of Novacium's prototype batteries, which could lead to larger defence ordersgradual
- no date from the companyHydrogenPro · Result of the strategic review (strategic investor, merger or sale)binary
- no date from the companyHydrogenPro · Definitive contract on two projects in the pipeline worth about NOK 300m (pending regulatory approval and technical review)binary
- OngoingHyperscale Data · Further Series H purchases from Ault & Company (up to USD 96m) – financing, but with dilution on conversiongradual
- no date from the companyInitiator Pharma · License or partner agreement for pudafensine (ED or FSD/vulvodynia)binary
- no dateKongsberg Automotive · Ruling on guarantee cases and insurance casebinary
- No dateLeclanché · Publication of the 2025 annual report and resumption of tradingbinary
- No dateLeclanché · Short-term financing from customers, a strategic partner or investor that can resolve the going concern questionbinary
- no date from the companyLifecare · Application for a pivotal CE-mark study (NOMA rejected the first application in March 2026)binary
- OpenMindMaze Therapeutics · Possible AI partnership and merger with Neuro.iobinary
- no date from the companyOcean GeoLoop · Appointment of a new CEO and completion of the sale of Ocean TuniCell to Lifecare (binding agreement 31/8-2026)gradual
- no date from the companyOcean GeoLoop · First pilot or customer contract for COOL (data center cooling)binary
- UndatedOroco Resource · Updated resource estimate and pre-feasibility study (the company only writes 'on pace')binary
- Not setPatagonia Gold · Feasibility study for Calcatreu and review of the Cap-Oeste underground option (mentioned as ongoing in the 2025 MD&A)binary
- No datePath2 Hydrogen · Delivery of a storage system to Golden Empire Transit and first projects with MP Industries in Europegradual
- No datePath2 Hydrogen · Exercise of the option to buy ProtonH2 (geological hydrogen), requires due diligence and shareholder approvalbinary
- OpenPharol · Distribution from the Rioforte bankruptcy estate on the recognised claim of EUR 897m (booked at 5.79%). Each additional percentage point in recovery equals approx. EUR 9m, approx. 12% of market cap.binary
- No datePhoton Energy · Publication of the revised 2025 annual report (PwC) with a possible going concern remarkbinary
- Not set (negotiations under way)PyroGenesis · Definitive agreements on a 1,000-ton fumed silica plant with HPQ, where PyroGenesis now owns 50% of HPQ Silica Polvere (completed 29/9-2026) and is exclusive equipment supplierbinary
- No dateScandinavian Medical Solutions · Appointment of a new permanent CEO after the change on 16/9-2026gradual
- no date from the companySenzime · First products and revenue from the OEM partnership with Philipsgradual
- Not disclosedSprint Bioscience · The first development milestone from Gilead on TREX1 (part of up to USD 400m)binary
- OngoingStenocare · Clarification of the German rules on prescribing and reimbursementbinary
- OngoingVerimatrix · Growth in subscription ARR (USD 16.1m, +11%), which must offset declining licences and maintenancegradual
- no dateViaplay · Possible joint bid from Canal+ and PPF (reported by Bloomberg in March 2026)binary
- No dateVistagen · FDA meeting on a new registration path for fasedienol (one phase 3 trial with LSAS as the endpoint plus PALISADE data)binary
- No dateVolitionRx · Publication of the Nu.Q Vet study on lymphoma in cats triggers a contractual milestone of 5m USD (manuscript in peer review since May 2026)binary
- no dateXCF Global · Forbearance or new payment plan with Greater Nevada Credit Union (USD 112.6m in default)binary

